Wexl Trails: 4 New Trails And Second Bike Lift Built By Doppelmayr

Wexl Trails: 4 new trails and second bike lift.  The pond lift becomes reality - planned completion: autumn 2025

The expansion of the upper trail park area began last season with the Insta360 line. A new lift is scheduled for completion in fall 2025.

  • The Teichlift starts about 200 meters from the current lift exit (towards Gasthof Orthof) and ends just below the Almrauschhütte.
  • Total length: 1,200 meters.
  • Manufacturer: Doppelmayr

NEW TRAILS: THE TRAILS WILL BE OPENED GRADUALLY DURING THE SEASON!

39 Terence Thrill - Black Singletrail

Terence Thrill - a black singletrail - starts at the reservoir and runs as directly as possible down to the entrance of the reservoir lift. Technical sections, small gaps, and plenty of speed await you!

38 Chuck NoRisk - Blue Singletrail

Singletrail fun for everyone! A blue trail designed to introduce beginners to the world of singletrails and safely introduce them to our technical routes. The trail is designed to bridge the gap between our flow trails and the red singletrails, thus contributing to rider progression.

33 Charlie Jibline - Red Jumpline

The upper flow trail is becoming a jibline! The popular upper flow trail from the reservoir down is about to get even more exciting. A varied trail design, playful features, and even more jumps await you.

36 Tiny Turner - Blue Flow Trail

The first section of our new flow trail, Tiny Turner, opened in fall 2024. It will continue in the same style until the lift entrance (pond lift). Numerous changes of direction, relaxed berms, and guaranteed flow are included!

Investment: approx. 2.5 million euros

https://www.wexltrails.at/

Share This Article