Three New Chairlifts For Ischgl

Three new 8-seater D-Line chairlifts with weather protection hood and seat heating in the Silvretta Arena by winter 2026/2027
Silvrettaseilbahn AG is investing 50 million euros in improving the comfort of the ski area and will build the replacement lifts HÖLLBODEN C1 and SASSGALUN C3 in summer 2025 and the HÖLLKAR C2 in summer 2026.
Since commissioning, these three lifts have transported a total of over 83 million enthusiastic winter sports enthusiasts. For the first time in the Silvretta Arena, all three chairlifts will be equipped with Doppelmayr's entry and exit monitoring system (AURO: Autonomous Ropeway Operation).
The Höllkar and Sassgalun railways will be rebuilt on the same route.
The mountain station of the new Höllbodenbahn will be built around 500 m east of the Idalp at a new location between slopes 10 and 11, just above the Idalp.
The diversion of the planned Höllboden cable car and the relocation of the mountain station opposite the existing 8-seater Höllboden chairlift should ensure that the crossing for winter sports enthusiasts in the area of the Höllboden/Idalp mountain station is significantly improved.
A total of over 1,200 m² of photovoltaic modules with a total output of 274.5 kWp will be installed on all roofs of the new cable car systems.
- Manufacturer of cable car technology: Doppelmayr
- Supply of haulage ropes: Teufelberger