Las Vagas’ Lee Canyon To Build A New 10,000-Square-Foot Lodge

Lee Canyon is excited to announce that they are building a new 10,000-square-foot Hillside Lodge that will improve the year-round guest experience at the resort. The two-story building is designed with a modern feel and considers the environment and guest experience by offering indoor and outdoor spaces with sweeping views of Lee Canyon. The Hillside Lodge will boast outdoor heated terrace and patio dining spaces, a ski-in, ski-out bar for Vegas’ best après, a bistro with reimagined food and beverage options, expanded restroom facilities and a renovation for our Bighorn Grill.

It's the biggest undertaking since the ski area first opened in 1964 and will totally transform the way our guests enjoy the resort, in summer and winter. The new Hillside Lodge was designed by Las Vegas-based Carpenter Sellers Del Gatto Architecture and will be a phenomenal jumping off point to better serve Las Vegas’ growing population and the growing demand for year-round, authentic outdoor recreation. The new Hillside Lodge will also include event space for meetings, special events and weddings, and the natural beauty of Lee Canyon will make the Hillside Lodge the most beautiful backdrop for any occasion.

Hillside Lodge construction preparation starts immediately. Unfortunately, during construction, Lee Canyon will not be open for its regular summer operations, however, hikers will be able to park at Lee Canyon and access the Bristlecone Trail from the upper parking lot.

The resort is owned and operated by Powdr Corporation in partnership with the United States Forest Service under a special use permit. The resort is typically open from November through April, with the best snow in February and March. The area's total of 385 skiable acres (0.6 sq mi; 1.6 km2) offers 11 alpine skiing and snowboarding trails. There are four lifts, including three chairlifts and one surface lift, as well as hike-to side-country areas and a freestyle terrain park.

Follow the Hillside Lodge build process here and by liking/following “leecanyonlv” on Facebook, Instagram or Twitter.

Share This Article